Outcome, technical baseline, scope, work decomposition, and acceptance
Provide an outcome, incomplete requirements, an architecture draft, mixed lifecycle obligations, several workstreams, a fixed external date and disputed scope. Ask the person to create a controllable technical project frame without designing the solution by proxy.
Confirm: The person names users outcome sponsor product and service owners; distinguishes product scope, project scope, technical baseline, assumption, constraint and proposed solution; traces requirements and quality attributes to acceptance owners and evidence; records system context boundaries components interfaces data environments suppliers and lifecycle states with architect and engineering owners; decomposes work around verifiable products and integration points rather than departments; includes security privacy accessibility operations migration support retirement and documentation work; identifies exclusions and unresolved decisions; selects predictive adaptive incremental or hybrid controls for the actual uncertainty; defines baseline approval and change thresholds; and does not treat a roadmap diagram, architecture draft or contract label as accepted technical fact.